Thyssen Mining was awarded the contract to sink a 3,250’ shaft in Northern Nevada. The shaft will be concrete lined with a finished diameter of 24’. To facilitate this work, Thyssen Mining erected the headframe and a hoist house complete with foundations and full installation of three hoists. In addition to sinking the shaft, Thyssen Mining is responsible for the procurement, installation, and commissioning of all underground and surface material handling infrastructure.
perfect replicaClient: Nevada Gold Mines
Date : May 2018 to February 2023
Project Scope: 3400ft concrete lined shaft, 24ft diameter
Project Location: Nevada