Turquoise Ridge Shaft #3 Project – Golconda, N (USA)
3400ft concrete lined shaft, 24ft diameter.
Turquoise Ridge Shaft #3 Project – Golconda, N (USA) Read More »
3400ft concrete lined shaft, 24ft diameter.
Turquoise Ridge Shaft #3 Project – Golconda, N (USA) Read More »
Mudjatik Thyssen Mining has completed a variety of projects at Cigar Lake Operations, such as shaft sinking, mine development and underground construction, as well as de-watering and mine remediation.
Cigar Lake Project (CA) Read More »
For over 15 years Mudjatik Thyssen Mining has been the Contractor responsible for underground excavation and development to meet the long term operational needs and infrastructure requirements of the McArthur River Operation.
McArthur River Project (CA) Read More »
In 2012 Thyssen Mining was awarded the contract for engineering and construction of the Newmont Leeville Ventilation Shaft No. 3, the first shaft sinking project in Nevada to employ ground freezing techniques.
Leeville Project (USA) Read More »
In 2009 Thyssen Mining was asked to help consult with block caving operations during the pre production period at Newgold’s New Afton Mine.
New Afton Mine (CA) Read More »