Goldrush Twin Declines- Cortez Mine Site (USA)

Thyssen Mining was the major contractor for the development of the Goldrush Twin Declines.  Twin parallel declines were constructed to access a new deposit.  Specifications called for two 18ft x 18ft modified arch profile drifts to be driven 62 feet apart for 13,000 feet each at a -3.7% decline.

Client: Nevada Gold Mines (NGM)

Date: July 2018 – December 2020

Project Scope: 3400ft concrete lined shaft, 24ft diameter

Project Location: Crescent Valley, Nevada