KAJV & Fermi Research Alliance FSCF Excavation – Fermilab Long Baseline Neutrino Facility, Lead, SD. Far Site Conventional Facilities Project. Undergound excavation and underground infrastructure.
Client: Fermi Research Alliance (FRA)
Date: November 2020 – Present
The FSCF Project is for the excavation and construction of the three caverns at the 4850 level and connecting drifts. Two of the Caverns measure 500’ Long x 92’ Height x 65’ Width and the third cavern will measure 625’ Long x 36’ Height x 64’ Width. TMI will excavate about 800,000 tons of rock in the construction of the three caverns.