Husky Oil Well Recovery (CA)
60 m deep freeze, 4.2 m diameter shaft x 7.2 m freeze circle.
Husky Oil Well Recovery (CA) Read More »
60 m deep freeze, 4.2 m diameter shaft x 7.2 m freeze circle.
Husky Oil Well Recovery (CA) Read More »
Underground rehabilitation, work of existing tunnels and development for new mining areas.
Development of 3,000 ft of new drift and 10,000 ft of rehabilitation work. Design and installation of ventilation airlock system and ore chute.
Greens Creek (USA) Read More »
In 2009 Thyssen Mining was asked to help consult with block caving operations during the pre production period at Newgold’s New Afton Mine.
New Afton Mine (CA) Read More »
Excavation of 1 M barrel underground cavern for storage of liquid butane.
Marathon’s Catlettsburg Butane Storage Caverns (USA) Read More »
Excavation of 31,000 ft of lateral development and 7,000 ft of underground raisebore work.
Henderson Mine (USA) Read More »