New Afton Mine (CA)

In 2009 Thyssen Mining was asked to help consult with block caving operations during the pre production period at Newgold’s New Afton Mine.

Client: New Gold Corporation

Date: July 2009 – June 2013

Project : New Afton Mine

Based on the success of this work, Thyssen Mining was then selected to perform underground bulk excavation, lateral development, and raise bore work.

replica patek philippe neptune