• Project:  New Afton Mine (Canada)
  • Client:  New Gold Corporation
  • Date:  July 2009 – June 2013

 In 2009 Thyssen Mining was asked to help consult with block caving operations  during the pre production period at Newgold’s New Afton Mine. Based on the success of this work, Thyssen Mining was then selected to perform underground bulk excavation, lateral development and raise bore work.

local challenges | GLOBAL SOLUTIONS